Explore

The Four Rings of Life.

PersonalityWho are you
CharacterWhat you stand for
ResourcesWhat you have
Well-BeingHow you feel
Tap any ring to see how it moves the others

Everything that shapes a life sorts into four forces. Personality — who you are. Character — what you stand for. Resources — what you have. Well-Being — how you feel. They aren't a personality type or a quiz; they are four measurable rings that constantly pull on one another. 4 Rings fits this model to your life, one day at a time - until you can see, in plain numbers, which ring moves the others and exactly where to push next.

Built on a peer-reviewed, within-person model - fitted to one person. You.

A journaling app for macOS An N-of-1 research instrument

A journal that fits
a model to your life.

Write the way you already think. 4 Rings turns daily reflection into both a quantitative model and a qualitative archive of your personality, character, resources, and well-being - fitted to one person. You.

4 Rings on macOS - Max's Journal with a scored entry, the day's calendar, and the four-rings model live on the right.
Personality
Big Five, expressed across contexts
Character
Virtues, purpose, values in action
Resources
Income, health, education, network
Well-Being
Hedonic + eudaimonic, daily
How it works

Write a sentence.
Gemma scores it. You confirm.

Every entry is decomposed sentence by sentence. A private, on-device model (Google's Gemma 4) proposes scores. Nothing is saved until you validate.

Step 01 · You

Write the way you already think.

A guided prompt or a blank page - the same plain prose you'd use in a notebook.

Step 02 · Gemma

A private model reads each sentence.

Gemma 4 runs entirely on your Mac, proposing scores across the four rings. No cloud, no account.

Step 03 · You confirm

You validate every score.

Click 1-5 to confirm or adjust. Only what you approve enters the dataset - traceable to its sentence.

Privacy

No internet. No exceptions.

4 Rings never makes a network call. No account, no cloud, no telemetry - the app runs fully offline, forever. Your journal is the most sensitive dataset you'll ever produce, and it lives on exactly one machine: yours.

Offline by design

Pull the WiFi out. The app keeps working. Gemma, your scores, your archive - all on-device.

  • × No server
  • × No API call
  • × No analytics
  • × No telemetry
4 Rings lock screen: a macOS window showing the 4-rings glyph, an Enter Passcode keypad, an Encrypted shield in the bottom-left, and a Stay-signed-in toggle in the bottom-right.
Lock screen · Encrypted at rest macOS
01

Encrypted at rest with your passcode.

Every entry, every score, every cell of the dataset is encrypted on disk using the Secure Enclave and a key derived from your passcode. Forget the passcode and the data is unreadable - even to us.

02

Apple Sign-In as a failsafe.

If you lose your passcode, the app falls back to your Apple ID - verified silently by macOS, never by us. You get back in. We still can't see your data. The failsafe is yours, not ours.

03

Migration stays encrypted.

Move to a new Mac and your archive travels as a single encrypted bundle. It is never decrypted in transit, never staged on a server, never visible to anything but the destination machine, after your passcode unlocks it.

04

AI runs entirely on-device.

All scoring and summaries run through Google's Gemma 4, executed locally on your Mac. No OpenAI, no Anthropic, no cloud LLM - not in the trial, not ever. Every AI conversation is as private as the rest of the journal.

I · Promise

No account, ever.

There is no sign-up, no login screen, no email collection. You download the app and start writing. There is nothing for us to leak, because we never had it.

II · Audit

Open to inspection.

Block the app at the macOS firewall - nothing breaks. Run any network monitor - you'll see zero outgoing traffic. The silence is the proof.

III · Ownership

Your data, your export.

Decrypt and export your complete dataset as CSV with Stata code whenever you like. You own every number; you can verify every calculation; nothing is opaque.

The model

Four constructs.
Six measurable pathways.

Each ring drives the other three through measurable, citable relationships. Tap any ring to trace the directed effects - and the literature behind them.

The four-rings model - 4 latent constructs
P C R W
The model
Tap a ring to explore
Each construct connects to the other three through directed, measurable pathways drawn from the literature.
PersonalityWho are you
CharacterWhat you stand for
ResourcesWhat you have
Well-BeingHow you feel
de Borst, J.P. (2026) - 4rings.app - · -
For dissertation students & researchers Read this first.
Instrument

A research instrument
built to publish from.

4 Rings was designed for the people writing dissertations, theses, and journal articles. The app is the front-end. The dataset is the point.

Every entry you write produces a row in a publication-grade, N-of-1 dataset - four constructs, 61+ validated variables, daily averages, full provenance back to the originating sentence.

The data is entirely private - stored on your Mac, encrypted, and never transmitted. It is also entirely yours - exportable as CSV, with companion Stata code to run the structural equation model on your own machine.

The minimum dataset for statistically valid analysis is 75 days. After that, you have a within-person SEM you can defend in a viva, cite in a paper, or print as evidence of reflective practice.

Study design
N-of-1, intra-person
Method
Deductive thematic
Framework
Idiographic
Quant. analysis
SEM · regression
Qual. analysis
Thematic · autoethnography
Export
CSV + Stata .do
4rings_dataset.csv 92 rows · sample
date day pers char res wb n_obs purpose
2026-02-150013.83.93.13.430.62
2026-02-160023.94.03.13.520.64
2026-02-170034.04.13.23.530.67
2026-02-180044.04.23.33.740.71
2026-02-190054.14.13.43.620.70
2026-02-200064.04.33.43.830.74
2026-02-210074.04.23.53.830.73
columns · 67 of 67 excerpt · 7 / 92
61+
Validated variables
75
Days, minimum
N = 1
By design
CSV
+ Stata code

See what 92 days of data look like.

A real, fully-populated sample dataset - exported from the app - with the Stata code and schema to run the structural equation model yourself.

In the app · Research tab
Your own data, one click away.

Inside 4 Rings, the Research tab includes a Download Data button that exports your full dataset and the matching Stata code - at any time, with no account, no API call, no friction.

Research → Download Data ↓ Export
Suitable for dissertations & coursework in
Behavioural economics Organisational behaviour Leadership Positive psychology Applied economics Entrepreneurship Personal development Health & well-being Reflective practice N-of-1 / single-case Mixed-methods research Autoethnography
Audiences

One instrument, three audiences.

Module leaders designing a curriculum. Students looking for a lifelong tool of self-knowledge. Faculty planning grants, projects, and publications.

Audience I
Module Leaders

The learning journal, upgraded into an instrument of analysis.

Most MBAs and many undergraduate degrees already prescribe a Reflections Journal or Learning Journal. 4 Rings keeps that pedagogy - and turns it into a scored, quantitative dataset students can defend in a viva or print as evidence.

  • 01 Drops into existing modules in OB, leadership, behavioural economics, entrepreneurship.
  • 02 Built-in rubric: 4 constructs and 61+ validated variables - no rubric design needed.
  • 03 Printable PDF with scores serves as evidence of reflective practice.
  • 04Designed to build character - the strongest direct predictor of well-being - through repeated practice, not assertion.
Outcome A reflective-practice unit that produces a publishable, defensible dataset.
Audience II
Students

A working model of yourself - for the rest of your life.

Self-knowledge is the foundation of every goal you will ever set. 4 Rings becomes a private dataset of who you are - growing with you through your degree, your career, your decades.

  • 01 Hand in the coursework. Keep the practice for life.
  • 02 Watch your character strengthen across years, not just terms.
  • 03 See suppressors before they cost you a job, a relationship, a project.
  • 04 Own a dataset of yourself - the most useful one you will ever produce.
Outcome A lifelong instrument of self-knowledge, in your own private hands.
Audience III
Faculty & Researchers

Plan the grant. Reflect into the paper.

A research career is the long composition of small intellectual moves. 4 Rings is the planning surface for that career - with the reflective depth that turns into the next argument.

  • 01 Multi-year Gantt for grant cycles, sabbaticals, paper pipelines - with budget rows.
  • 02 Daily reflection becomes a defensible, citeable N-of-1 case study.
  • 03 Track resources (funding, time, network) against well-being and output.
  • 04 Export your own dataset to publish a methods paper on the practice itself.
Outcome Grants planned, papers published, well-being defended - in one instrument.
Journal

Reflection, scored.

A daily structured reflection - minutes long - produces four ring scores in your own words, with full provenance.

The Journal pane

Guided reflection
across all four rings.

Score your personality, character, resources, and well-being honestly - or write freely and let Gemma 4 (Google's most advanced on-device LLM) suggest scores from your text. Either way, you confirm. Every number is traceable to the sentence that produced it.

The app structures your thinking. You provide the truth.

“I never thought journaling could be this structured and still feel personal. Seeing the four rings light up was an instant shift in perspective.” M.K. · MBA, Cambridge Judge
Time to entry
4-8 minutes
Variables touched
up to 61
AI scoring
Gemma 4, on-device
Export
CSV · printable PDF
Journal · macOS
4 Rings Journal pane: calendar sidebar, scored entry, and the 4-rings model live as you write.
The Journal pane
How it works

Write a sentence.
Gemma scores it. You confirm.

Every entry is decomposed sentence by sentence. A private, on-device language model (Google's Gemma 4) proposes an interpretation and ring scores. Nothing is saved until you validate.

Journal · Score Sentences · macOS
3 / 3 scored
4 Rings - the Journal pane mid-scoring. Each sentence on the left has a Gemma-generated interpretation in the middle column, and proposed Personality, Character, Resources, and Well-Being scores on the right that the user clicks to confirm.
Step 01 · You

Write the way you already think.

A guided prompt or a blank page. Plan your day, recap an evening, or work through a decision - in the same plain prose you'd use in a notebook.

InputFree text · 4-8 min
Step 02 · Gemma

A private model reads each sentence.

Google's Gemma 4 runs entirely on your Mac. It splits the entry into sentences, writes a short interpretation for each, and proposes scores against the four rings and the 61+ validated variables. No network call. No account. No cloud.

EngineGemma 4 · on-device
Step 03 · You confirm

You validate every score.

Each proposed score sits next to its source sentence. Click 1-5 to confirm or adjust; reject a theme; add your own. Only the values you approve land in the dataset - with a permanent line back to the sentence that produced them.

OutputA scored, citable row
Plan

Goals & habits, aligned to the model.

Every reminder you complete moves a specific construct. Character is built indirectly - by what you do.

The Plan pane

A Gantt chart for your life - with a budget row.

The Plan tab is a true Gantt chart: life goals, long-term projects, medium-term milestones, weekly habits and daily reminders, all stretched across a timeline from day to year. Every completed tick scores a construct.

Each goal or reminder can carry a cost. Costs roll up into a budget row at the bottom of the chart - so you can see, week by week, what your plan actually demands of your finances. Built for students juggling tuition, conferences, fieldwork, and rent.

“Connecting my daily habits to my long-term goals - and seeing the cost of all of it on one timeline - made everything click.” A.R. · Oxford, DPhil candidate
Chart type
Gantt · day → year
Hierarchy
Goal · Project · Habit
Budget
Rolled-up costs
Each tick
moves a construct
Plan · macOS
4 Rings Plan pane: a Gantt chart of life goals, projects, and habits across a timeline.
The Plan pane - Gantt of life goals
Life Plan Wizard - your baseline survey
Life Plan Wizard, baseline survey
Budget rows - income, expenses, cumulative net
Plan budget rows showing income, expenses, and cumulative net
Science

The model, fitted to you.

The structural equation model reveals the strongest pathways in your life, the hidden suppressors, and where to focus for maximum impact.

The Science pane

Hidden pathways, now visible.

Visualise change over time across all four rings and their 61+ variables. Watch which pathways are strongest, which are suppressing your outcomes, and which to invest in next quarter.

Character strengthens as an indirect effect of completing the actions in your plan. The system shows that - quantitatively.

“The quarterly review showed me I was paradoxically lowering my income by working too hard. Once I adjusted, my resources and well-being increased.” D.S. · LSE faculty
Minimum dataset
75 days
Export
CSV + Stata
Analysis
SEM · regression
Method
N-of-1, idiographic
Science · macOS
Science pane, Academic view: the Abstract with the four-rings structural model showing 12 directed paths between Personality, Character, Resources, and Well-Being.
Quantitative Data
Findings view: distribution curves, a descriptive-statistics table, and quantitative scatter-plot regressions with β coefficients and p-values.
Academic write-up - auto-generated from your data
Academic Conclusion section: a full auto-generated write-up synthesising the model's findings with β coefficients and qualitative quotes from the journal.
Trajectory

Benefits that compound.

From the first entry to the first quarterly review - what the practice actually does, on what schedule.

Day 1 · Immediately

One entry, four rings.

Complete one guided reflection and see your four rings scored. A new perspective on your life in minutes - structured, quantified, and entirely in your own words.

Day 7 · This week

The needle moves.

As you journal and tick off your plan, your scores shift in real time against your baseline. You start to see which actions actually change the readings.

Day 30 · Patterns

Patterns emerge.

Your personality expression across contexts becomes visible. Connections between character-driven actions and resource outcomes take shape on the chart.

Day 90 · Review

The Data Speaks.

A mixed methods, academic article is produced that informs the 4 Rings AI and a Dataset is produced that you can validate. Using Structural Equation Modelling & Thematic Analysis.

- Field note · Q1 2026 -

My conscientiousness was too high, my extraversion too low. Once I adjusted, my resources and well-being both increased.

4 Rings user · quarterly review insight

Pricing

One purchase. Yours forever.

No subscription, no recurring fees. Like Things 3 or Bear - buy once, own it.

Education
£50
One-time · Save £40
Valid student or academic email required. Full app, all features, all future updates. Limited availability for the 2026 cohort.
Standard
£90
One-time
Full app, all features, all future updates. No subscription, ever. Direct download from 4rings.app - DMG, notarised, signed.
University Bulk
from£19
Per student · Min. 50
Ideal for modules in behavioural economics, OB, leadership, personal development. Gemma 4 can be disabled per institutional policy. Contact for pricing.
Direct from 4rings.app. macOS Tahoe 26.3 or later · DMG · Notarised & signed · Try free for 7 days - no card required.
Download 4 Rings Free for 7 days · then £50 one-time
Research

For students & researchers.

Validated constructs. Publication-grade data. Full transparency, end to end.

Academic article · Open access

The Four Rings of Life - How to Increase Your Resources, Wealth, Life Satisfaction & Happiness Through Your Unique Personality and a Strengthening of Character

J.P. de Borst, PhD · 48pp · 2026

Aristotelian virtue and eudaimonia in a mixed-methods, intra-person study where n = 1. Full theoretical model, SEM validation, and empirical results.

Download PDF
White paper · Plain language

The Four Rings of Life - A Practical Guide to Increasing Well-Being & Resources Through Self-Reflection

J.P. de Borst, PhD · 22pp · 2026

The same research without academic jargon. Understand how the four constructs work together and why they matter for your life.

Download PDF
About the
dataset

Publication-grade, by design.

4 Rings produces a self-reported, intra-person (N-of-1) dataset structured around four constructs and the 61+ validated variables they comprise. Each data point is a daily average of scores derived from journal entries. All data is traceable to its source sentence - no opaque algorithmic inference.

For statistically valid analysis, the dataset requires at least 75 days of entries. This can be aligned with a university requirement for a Learning Journal or Reflections Journal - and printed with scores as evidence of reflective practice.

The data collection method is a deductive thematic approach: each journal entry is decomposed into themes that are pre-assigned from the four constructs and their 61+ variables - not discovered post-hoc. The inferential framework is idiographic (within-person), suitable for structural equation modelling and regression on the user's own data. Qualitative analyses include within-case thematic analysis and autoethnography. Suitable for courses and dissertations in behavioural economics, organisational behaviour, leadership, positive psychology, applied economics, entrepreneurship, and health & well-being.

Design
N-of-1, intra-person
Method
Deductive thematic
Framework
Idiographic
Export
CSV + Stata code
The author

About Dr. de Borst.

The 4 Rings of Life is built on the doctoral research of J.P. de Borst - researcher, entrepreneur, author, and dissertation tutor.

Dr Johan de Borst
Dr. Johan de Borst

J.P. de Borst

PhD · MBA · BComm

Dr. Johan de Borst completed his PhD in Entrepreneurship Research at the University of Strathclyde - a fully funded scholarship - with a focus on applied and behavioural economics, specifically the relationship between income, personality, eudaimonia, and hedonic well-being.

He is also a dissertation tutor with 3,500+ five-star reviews, working with students from Cambridge, Oxford, UCL, LSE, Imperial, and other leading universities. 4 Rings is the practical expression of his research.

  • 2023–Present4 Rings - developer & researcher
  • 2019–Present3,500+ five-star reviews as a PhD dissertation tutor
  • 2020Author of Our Lit
  • 2018PhD, Entrepreneurship Research, fully funded scholarship - University of Strathclyde
  • 2014Doctoral research presented at the Babson Entrepreneurship Research Conference, Norway
  • 2012MBA - Babson College (ranked #1 for Entrepreneurship) · European Scholarship Award winner
  • 2008Ireland's College Entrepreneur of the Year
  • 2007Accenture Leaders of Tomorrow
  • 2005BComm - University College Dublin
Elsewhere · the same mind, two other projects
DrJohanTutoring.com - the site's dark, gold-lettered hero: 'Elite tuition, for elite families.'
Private tuition

Dr Johan Tutoring

The other side of the desk. As "Dr J." he mentors just ten business & economics students at a time - Foundation Year through PhD - with examiner-standard feedback and 3,500+ five-star reviews. The same long-arc attention that shaped 4 Rings.

DrJohanTutoring.com
Our Lit by Li Tchaikov - book cover: a glowing golden figure in a vast vertical jungle-world, threads of coloured light crossing in an X beneath a crescent moon.
A novel · under the name Li Tchaikov

Our Lit

A literary science-fantasy novel set in Terra Aurora, a far-future world made of light where every soul glows its own colour - and a loved Mind tends the four rings of every life: character, well-being, resources, personality. Yes - the very same four.

OurLit.site
Included free

Every 4 Rings purchase comes with a free copy of Our Lit, the novel - where the four rings were born.